top of page

infraTECH Completes $300M US 75 Project as Prime Contractor for TxDOT

infraTECH recently completed the US 75 Roadway Widening and Reconstruction Project as the prime design contractor for TxDOT's Paris District. The project involved the widening and reconstruction of 5.5 miles of US 75 and included comprehensive roadway and bridge design, hydrologic and hydraulic design, signing, pavement marking, signal and illumination design, ITS design, utility coordination, survey work, retaining wall design, and geotechnical data collection. A total of fifteen bridges were reconstructed as part of this project, with an estimated total cost of $300 million.

bottom of page