top of page

PROJECT PORTFOLIO

Direct Connectors at Beltway 8/Hardy Toll Road Interchange

Lamar Levee Railroad Closure Gates

FPV02 DOW Barge Canal Navigation Gate

US 75 Widening and Reconstruction

SH 194 Rehabilitation

Sam Houston Tollway Direct Connector / SH 225

FM 1750 Schematic and Environment Studies

SH 79/ US 287 Schematic

FM 57 Widening

Genoa Pavement Rehabilitation

E Meyer Avenue Sidewalk

Hike and Bike Trail – Pine Brook Phase 1

Beltway 8 and SH225 Interchange – Bridges and Retaining Walls

FPV03 Velasco Memorial Tidal Gate and Floodwalls

FPV04 Floodwalls, Levees and Drainage Structures

Dallas District Wide Routine Bridge Rehabilitation

US 75 Reconstruction – Bridges and Walls

Adams and Cow Bayou Value Engineering

IHNC Seabrook Sector Gate Complex

Bayou Dupre Sector Gate (LPV 144)

LPV145 Floodwalls - Bayou Bienvenue to Bayou Dupre

Tyler District Signal and Pedestrian Infrastructure Upgrade

Intersection Improvements - Dixie Farm (FM 518)

TxDOT Tyler HSIP Projects

HCTRA Active Transportation Project

FM 521 Widening

Buffalo Speedway Reconstruction

Danubina Flood Mitigation

Belle Park Culvert Replacement

Drainage Study for Jackson Road

US 90 Grade Separation at UPRR

Smith Street Drainage Improvement

Vaccaro Manor Drainage Improvement

GEC for SH 99 (Grand Parkway) Segments H & I

GEC for IH2/IH 69C Interchange

FICAP Baseline Drawings

Vietnam Fallen Warriors Monument

Missouri City Estates Drainage Improvements

Aldine Northeast and West Pavement Rehabilitation

BOOST Route 82 Design

City of Houston Local Drainage Program

METRO Urban Accessibility Design

BI 20 Bridge Rehabilitation

HCTRA Toll Entry

IH 69/US 59 Special Junction Box

bottom of page