US 75 Widening and Reconstruction

SALIENT FEATURES

  • Roadway Design

  • Drainage Analysis and Design

  • Retaining Wall Design

  • ITS, Signing, Pavement Marking, Signal and Illumination

  • SW3P

  • A+B Contracting

  • Construction Cost: $300M+

  • infraTECH served as Prime Consultant

CLIENT

Texas Department of Transportation (TxDOT), Paris District

LOCATION:

Grayson County, Texas

BACKGROUND

The goals of the US 75 from US 82 to SH 91 and N Loy Lake Rd to US 82 project are to widen the US main lanes from four lanes to six, with 10-foot shoulders, widen the frontage roads to accommodate three lanes in each direction, and reconstruct the ramps and interchanges along US 75. Multiple disciplines are involved, including highway, structures, pavement, drainage, illumination, ITS, signing, pavement marking and SW3P.

PROJECT FEATURE

The overall roadway length is approximately 6 miles.


Some of the major components of the project include:

  • 15 Bridges along the corridor

  • 13,000 ft. of MSE Wall and 3,000 ft. of Soil Nail Retaining Walls

  • 15 Cross Culverts modification

  • US 75 main lane and frontage road widening and reconstruction

  • Reconstructing entrance and exit ramps (29 Ramps)

  • Drainage (including hydraulic analysis of 15 culverts)

  • Traffic (all traffic operations in the final condition and during construction, as well as construction plan sequence)


RELEVANT SERVICES

As the prime consultant of this PS&E project, infraTECH was responsible for the design of the US 75 main lane widening, reconstructing entrance and exit ramps, frontage road, bridges, retaining walls, drainage, signing & pavement marking, signal, illumination, ITS and SWPPP. Additionally, infraTECH managed the storage and organization of all project files. infraTECH worked closely with TxDOT and teaming partners including HDR, ATKINS, Aguirre & Fields, PGAL, Gauge, HVJ and GAI to complete this accelerated schedule project on time.

infraTECH team recently completed PS&E package for US 75 Segment 5, the largest ongoing project with accelerated schedule in Paris District. With out of the box thinking & proactive approaches, infraTECH have exceeded project requirements, maintained budget, & advanced schedule. Through effective communication, they also minimized utility impact and ROW issues. Without these proactive attitudes from infraTECH, it would be impossible for the District to complete this project in a very accelerated schedule effectively.


Etienne Etchouekang, PE,

US 75 PM, TxDOT Paris District